跳至主要内容

Boland's Profile

 

View of Boland

Shenzhen Boland Renewable Energy Co.,Ltd is a new energy and power company that combines wind power, solar power and storage batteries to provide you with high quality integrated wind and storage system solutions. Boland's partner is CRRC, which has been contracted for high speed rail projects in China, and we have a relatively complete internal supply chain, service network and excellent product quality and technology.





 Boland's products

Boland's product range is very broad and includes not only wind, solar and storage products, but also integrated design solutions for wind, solar and storage (and even diesel engines).

Solar power

Model:Solar Tile ,Small Panel-Full Cell,Small Panel-Cut Cell ,Thin Panel,Flexible Panel , PCB Panel and son on.

Application:Our solar products are not only suitable for new villas, self-built houses and public buildings, but some of them can also be used in larger off-grid systems and for camping and tourism personnel and military units in the field.

Wind power

Model:Small wind turbines, large wind turbines, MW class super large wind turbines, Boland is at your service

Application:Boland's partner is CRRC, which has been contracted for high speed rail projects in China, Boland and CRRC will now join forces to open super large MW-class turbines.Wind turbines for off-grid systems, wind turbines for on-grid connected systems,Both sea and onshore wind farms are possible.

Energy Storage Products

Model:Domestic type energy storage battery, industrial and commercial energy storage battery, portable energy storage battery, wind and solar power integrated energy storage battery.

Application:For domestic use, for use in shopping malls, for use in industrial sites, for use in power plants. Can also be used as a rechargeable battery.

Integrated solutions for wind&solar&energy storage systems (even including diesel)

We have an excellent engineering team and can arrange customisation to make the most of solar, wind, hydro and even diesel resources to maximise the efficiency of your power generation, choosing the optimal combination system for you.

Other Product Services

Boland is committed to the development of new energy generation products and is keeping pace with the times and is willing to work towards carbon neutrality.











  Please feel free contact us if you need any technical support.

My email:marketing@boland-hydroturbine.com

WA:+8613923745989

Boland’s office website:https://bolandnewenergy.com/

Boland’s facebook:https://www.facebook.com/Bolandrenewableenergy

YouTube home page:https://www.youtube.com/channel/UC6aR-4J85p5LZluVll7otYA

 

 

评论

此博客中的热门博文

Baihetan Hydropower Station set to help with China’s carbon goal

  The Baihetan Hydropower Station has officially started storing water as the gate of number two diversion bottom hole closed on April 6, meaning the world's largest hydropower project under construction has taken a critical step toward the goal for the first batch of hydropower units to start generating electricity on July 1.  With the closing of the gate, the reservoir water level began to rise from 655 meters, according to a statement from Sinohydro Engineering Bureau 8 Co, adding that the reservoir water level will be stored to 775 meters in mid-June to meet the conditions for the first batch of hydropower-generating units to start operation. From August to September, the reservoir water will be stored to 800 meters, and then gradually stored to the normal storage level of 825 meters in June 2022. The total storage capacity of Baihetan Reservoir will be 20.627 billion cubic meters, which accounts for 91 percent of the Jinsha River Basin. The flood control reservoir is an i...

40.8MW Koto Hydropower Project To Be Completed by December

  About 90 per cent work on the under-construction Koto hydropower project (Koto-HPP) has been done and it will be completed by December this year, said assistant project director while briefing a team of the district administration. The team, including deputy commissioner Aun Haider Gondal, Timergara assistant commissioner Tahir Ali and other officials, visited the project site here the other day. Giving details, Koto-HPP assistant director Mohammad Shuaib said the powerhouse would generate 40.8MW of electricity that would be added to the national grid. He said that the remaining 10 per cent work on the project would be completed by coming December. He said work on the power tunnel had been completed by the contractor before its stipulated time. The deputy commissioner inspected various portions of the power station like box channel, surge shaft, sand trap and powerhouse and assured his full cooperation on part of his district administration for the timely completion of the projec...

Global hydropower market ‘to see compound growth rate of 2.4% until 2030’

                                              https://www.boland-hydroturbine.com/ The global hydropower market is likely to grow at a Compound Annual Growth Rate (CAGR) of 2.4% until 2030. That’s according to data and analytics company GlobalData, which expects the sector will reach more than 165GW of installed capacity by this time, up from 124GW at the end of 2018. More than 18% of global electricity generation capacity currently comes from hydropower plants, with China, the US, Brazil, Canada, Russia, India, Japan, Norway, Turkey and France representing almost 70% of this proportion at the end of 2018. Ankit Mathur, Practice Head of Power at GlobalData, said: “China, which is rich in hydro resources, will continue to preserve its monopoly as the leading country until 2030, with more than 22 projects of gigawatt size under construction, slated to...