Get To Know China's Hydropower Plants----Huangdeng Hydropower Station

 Introduction

At 00:00 on January 1, 2019, four units of Dahuabiao, Huangdeng, Wulonglong and Lidi hydropower stations with a total of 1,092,500 kilowatts were successfully put into operation. 

The four units put into operation on the same day once again refreshed the world hydropower  commissioning record of "one-day double commissioning" set by the company on July 12, 2018. 

So far, all eight units of Huangdeng and Dahuaqiao hydropower stations have been put into operation. The total installed capacity has reached 24,992,800 kilowatts, the asset size has exceeded 180 billion yuan, and the cumulative power generation has exceeded 570 billion kilowatt hours.

Geographic location.

Huangdeng Hydropower Station is located in Lanping County, Nujiang Prefecture, Yunnan Province. It is developed by dike and dam, and is the fifth stage hydropower station in the hydropower ladder development program of the upper reaches of the Lancang River in Yunnan Province from Gushui to Miaowei River, mainly for power generation.

Installed capacity.

On August 16, 2018, Unit 3 of Huangdeng Hydropower Station, constructed by Hydropower Bureau XIV, passed the 72-hour trial run in one go, and was officially handed over to the power plant and put into commercial operation. 

Upstream of Toba Hydropower Station, downstream of which is connected with Dahuaqiao  hydropower Station, the dam site is located upstream of Yingpan Town, Huangdeng Hydropower Station has an installed capacity of 1900MW (4×475MW), with a guaranteed output of 507.95MW and an annual power generation capacity of 8.629 billion kWh.

So far, the power station has achieved the nodal target of power generation of the first 3 units. Huangdeng Hydropower Station Unit 3 is in a very stable state of trial operation, achieving water filling, start-up, grid connection and 72-hour trial run successfully at one time.

 

During the trial run, the bearing tile temperature, vibration, swing and temperature of each part of the unit are better than the design requirements. 

Up to now, Unit 1, Unit 2 and Unit 3 have successfully achieved one-time start-up, passed all tests and passed 72-hour test run at one time. 

Significance.

The Huangdeng Hydropower Dam, China's tallest crushed concrete gravity dam, stands at the foot of the Bilo Mountains in Lamping Bai Pumi Autonomous County, Nujiang Lisu Autonomous Prefecture. Huangdeng Hydropower Station is the fifth level of hydropower station in the Lancang River Basin, and as the main power source for the "West-East Power Transmission" and Yunnan Province to build a world-class "green energy brand", the station has painted a picture of the Lancang River from construction to operation with the concept of green development. A poetic landscape picture.

When you go to Huangdeng Hydropower Station camp, there are some trees on both sides of the road that are surrounded by a retaining wall and enjoy "special treatment", which are rare trees left behind by the power station builders. According to the staff, terrestrial ecological demonstration park transplanted the national secondary key protection of wild plants and red hair Tsubaki, as well as part of the local narrow distribution of plants pointed leaves MuXiLan and QingXiangMu. "Pointed-leaf mignonette olive is a close relative of the Mediterranean edible oil olive, with similar value to wild rice gene conservation.
The fish lift is arranged at the tailwater mouth of the power station, using the power generation tailwater current to lure fish, using an automatic guide car to transport fish boxes, and when the dam lift finishes lifting the transfer across the dam, the fish carrier transports the fish to the reservoir rivers for release, truly automating the whole process of luring fish, catching fish, transporting fish and releasing fish. A way to pick up the steps, to Huangdeng Hydropower Station dam site downstream of the Lancang River upstream section of fish stocking station. Huangdeng Hydropower Station's artificial stocking activities are carried out once a year, and a total of 842,000 tails have been artificially released since the station was built, including 170,000 Lancang split-bellied fish and 270,000 grey split-bellied fish.


Disclaimer: The above content is for reference only and we do not guarantee the accuracy, truthfulness, completeness, validity and timeliness of all or part of the article (including but not limited to text, data and charts).Reproduction of the above content for commercial purposes is prohibited. For non-commercial purposes, please contact us. Please retain information such as the original author of the article when reprinting, and the content must be strictly consistent with this article and must not modify/replace/add or subtract any text contained in this article, or add subheadings, quotations, abstracts, etc. without permission. Extracts, derivations and interpretations of all content published on this website are prohibited. This statement applies to all information published on this website




Boland is a hydropower equipment company with 60 years of experience that can contract hydropower EM and EPC projects. Boland has one of the top 8 engineering design teams in China.We can provide you with expert technical advice and solution regarding hydroelectric power plant. And we have teamed up with China CRRC. All of China's high-speed rail projects are built by CRRC.

Boland's units have been installed in more than 1000 locations in China and in more than 20 countries abroad, such as Indonesia, Brazil, Cuba, Vietnam, Myanmar, Malaysia and the Philippines.

Please feel free contact us if you need any technical support.

My email:marketing@boland-hydroturbine.com

WA:+8613923745989

Boland’s office website:https://www.boland-hydropower.com/

Boland’s facebook:https://www.facebook.com/bolandhydrogenerator

YouTube home page:https://www.youtube.com/channel/UC6aR-4J85p5LZluVll7otYA



评论

此博客中的热门博文

Bill Gates-led Fund Invests in Startup That Built a New Hydropower Turbine

                                           https://www.boland-hydroturbine.com/ Hydropower—converting moving water into energy—is the single biggest source of clean power in the world, but relies on a 200-year-old technology that hasn't changed all that much. Natel Energy Inc., a California-based hydro power startup, has developed a new turbine that updates that technology, and now the company is raising $11 million in a funding round led by Schneider Electric Ventures and Breakthrough Energy Ventures, a fund helmed by Bill Gates. The turbine lowers the construction cost of power plants, because it requires less cement and steel. It also allows for safer passage for fish, which has become a stringent environmental regulation for these types of projects in both the U.S. and Europe. Natel Energy was started by two engineers and siblings, Gia a...

How we can save hydropower

                                        marketing@boland-hydroturbine.com Hydropower is the world’s third largest source of electricity and provides around 70% of the world’s renewable energy. However, dams – the traditional way we’ve harvested energy from water – are not as sustainable as you might think, disrupting the ecosystems within and around rivers, reducing biodiversity, and messing with water quality. Now, researchers are trying to find a way to make hydropower more environmentally friendly. “It’s only recently that people have started to realize that these dams fill up with sediment, that they are structurally unsound, some of them, and that something needs to be done with them,” says Carlos Garcia de Leaniz of Swansea University in Wales. But the world needs energy, and compared to other forms of renewable energy, hydropower is both flexib...

Baihetan Hydropower Station set to help with China’s carbon goal

  The Baihetan Hydropower Station has officially started storing water as the gate of number two diversion bottom hole closed on April 6, meaning the world's largest hydropower project under construction has taken a critical step toward the goal for the first batch of hydropower units to start generating electricity on July 1.  With the closing of the gate, the reservoir water level began to rise from 655 meters, according to a statement from Sinohydro Engineering Bureau 8 Co, adding that the reservoir water level will be stored to 775 meters in mid-June to meet the conditions for the first batch of hydropower-generating units to start operation. From August to September, the reservoir water will be stored to 800 meters, and then gradually stored to the normal storage level of 825 meters in June 2022. The total storage capacity of Baihetan Reservoir will be 20.627 billion cubic meters, which accounts for 91 percent of the Jinsha River Basin. The flood control reservoir is an i...