Hydropower, the only solution for cheapest power generation

                                                https://www.boland-hydroturbine.com/
Hydropower has the lowest life-cycle cost of any power generation technology. Hydropower is a potential life-saver for Pakistan. Yet its development has been hampered for decades. Hence, only 15 percent of Pakistan’s over 60,000MW hydropower potential has been developed in 70 years.
Hydropower plants power generation can give a country economy a new path of progress. Despite initial costs and long gestation periods, hydropower plants have almost no fuel cost and have operational lives of over a century.
New hydropwer plants generate electricity at Rs6-10 per unit compared to thermal power plants’ Rs15-25 per unit. All other power-generating technologies have up to 30 years of project life and need up to four times expensive plant replacements in foreign exchange.
Wind and solar technologies are solely dependent on the weather. They can at best supplement but not replace hydropower which, amongst others, can provide a range of valuable services, including frequency control, grid balancing, water storage, quick start, and peaking services not inherent in wind and solar generation.
Hydropower projects that have approved sites, available finances, approved tariffs, and strong sponsors are being pushed back, thus effectively killing them in favor of renewables that still have no sponsors, sites, financing, planning, or grid evacuation studies.
It has to be kept in mind that many hydropower resources are located in Azad Jammu and Kashmir and Gilgit-Baltistan. Unfortunately, international financiers have stopped lending for projects in Azad Jammu and Kashmir owing to its disputed territorial status and pressure from India.
The 350MW Athmuqam project on the Neelum River (Azad Jammu and Kashmir) and 4,500MW Diamer-Bhasha on the Indus (Gilgit-Baltistan) are its examples.
In short, being a developing country, we have to move towards hydropower.
Technologytimes.Pk

评论

此博客中的热门博文

40.8MW Koto Hydropower Project To Be Completed by December

  About 90 per cent work on the under-construction Koto hydropower project (Koto-HPP) has been done and it will be completed by December this year, said assistant project director while briefing a team of the district administration. The team, including deputy commissioner Aun Haider Gondal, Timergara assistant commissioner Tahir Ali and other officials, visited the project site here the other day. Giving details, Koto-HPP assistant director Mohammad Shuaib said the powerhouse would generate 40.8MW of electricity that would be added to the national grid. He said that the remaining 10 per cent work on the project would be completed by coming December. He said work on the power tunnel had been completed by the contractor before its stipulated time. The deputy commissioner inspected various portions of the power station like box channel, surge shaft, sand trap and powerhouse and assured his full cooperation on part of his district administration for the timely completion of the projec...

Baihetan Hydropower Station set to help with China’s carbon goal

  The Baihetan Hydropower Station has officially started storing water as the gate of number two diversion bottom hole closed on April 6, meaning the world's largest hydropower project under construction has taken a critical step toward the goal for the first batch of hydropower units to start generating electricity on July 1.  With the closing of the gate, the reservoir water level began to rise from 655 meters, according to a statement from Sinohydro Engineering Bureau 8 Co, adding that the reservoir water level will be stored to 775 meters in mid-June to meet the conditions for the first batch of hydropower-generating units to start operation. From August to September, the reservoir water will be stored to 800 meters, and then gradually stored to the normal storage level of 825 meters in June 2022. The total storage capacity of Baihetan Reservoir will be 20.627 billion cubic meters, which accounts for 91 percent of the Jinsha River Basin. The flood control reservoir is an i...

Preparations for construction of 2400MW Batoka Gorge Hydropower Plant move a gear up

                                                        The Environmental and Social Impact Assessment (ESIA) disclosure process for the 4.5 billion U.S.   dollars Batoka Gorge Hydro-Electric Scheme (BGHES) has been completed, paving the way for the  implementation of the project, an official said Thursday. Chairperson of the Zambezi River Authority Council of Ministers, Zhemu Soda, who is also Zimbabwean Minister of Energy and Power Development, made the disclosure during the 38th Council of Ministers virtual meeting held Thursday. "It is encouraging to learn that most of the preparatory works for the implementation of the scheme have been completed. This includes the updating of the 1993 engineering feasibility studies and the undertaking of the environmental and social impact assessment (ESIA) studies which have culminated in the p...